Trending

Monday, January 11, 2010

Gettin' Down and Dirty

So it's been about 2 weeks since our basement went from this:





To this:




... In one night. So it's time that I bring you up to speed on where we are now, as I feel we've come a long way for two weeks of labour.


B had Thursday off while the guys came to install our new tankless water heater. After the guys left, B got to work getting the tape and the first coat of mud onto the drywall. We let that set and on Friday, B got another coat of mud onto the wall and then got to work, redirecting all of our plumbing, to the whole house (we moved the location of the water heater from the front of the house to closer to the back. So B had to rework the plumbing so that the hot water had a shorter distance to travel to ALL faucets/shower heads in the house).


Sunday we were up bright and early, sanding the walls (dust masks required FOR SURE!) and cleaning up the room in preparation for laying tile. 





My Dad headed over to help us out with laying the tile, as it was our first tiling job, and I was certain I wanted our square tiles laid in a diamond pattern to give it that something extra. (B didn't want to attempt this pattern on our first job... I don't blame him). We're both really happy we went with the diamond pattern though. One of those little things that will make a big difference in the look of the room.





So for the day I was in charge of the tile saw (to cold to work outside, so we set it up in what will later become our new and improved basement bathroom), while B and my Dad worked quickly to lay the tile and then we'd work together to clean up the thinset from the spaces between the tiles and double check the lines. It took most of the day, with a break only to stop for dinner. By the end of the day our laundry room looked something more like this....





Not too shabby, huh? Tonight was all about getting the grout in between the tiles. I mixed it up and B got it on there as quickly and efficiently as possible. We used a light grey, quick set grout that I think is going to be perfect for our light grey tiles! 





Now we just have to let it sit so we can get that white "haze" off top. Tomorrow... we paint! I can hardly wait!
SHARE:

Saturday, January 9, 2010

An "AirFare" to Remember

I don't know if anyone has heard of it, or seen it - but Homemakers.com is hosting a contest called "I Knew It was Love When...". They are calling for entries on when you knew you were in love with your significant other. The winning couple wins a romantic trip for two to the Grand Cayman Island for 7 days and 6 nights. How sweet is that? So, I entered our story! :)





This is where I ask for you help! Right now they are accepting entries and ask people to get as many views and comments as possible (I believe they are also monitoring where your views are coming from - so how many places online you are sharing your story!). All entries need to be received by February 14th and from there 10 finalists will be chosen based on popularity. The final winner will be chosen based on the most votes received out of those 10 finalists. Right now I'm just asking for your help to get the word out about our story! Comments would be great, but even if you can visit whenever you remember, and share our link with friends and family - we'd really appreciate it.


I know most of my readers know what it's like to be on a tight budget when working on home renos. Of course with everything we have planned for this year, there will be no money for a nice long getaway this year - so winning this contest would be great!
SHARE:

Thursday, January 7, 2010

Radiator Love



Radiators... I love 'em! I know it may sound crazy - but I do love the look of them. After admitting this to B last month at a friends Christmas party (where I spotted an original in their Toronto home) he looked at me like I was mad. After telling me how inefficient they are, I admitted I didn't want one that was used to heat my home - I just love how they add character to homes that would've once been heated by them.

Well - let me tell you how excited I was when I opened the February 2010 copy of Canadian House & Home Magazine last night and discovered a small piece on ECORAD. Let me give you a low-down on ECORAD and what they do (incase you missed it in the magazine). The gist of it: ECORAD takes old discarded cast iron radiators, saves them from ending up in the dump and converts them to electrified raditor systems! YUP! They'll even take one you own and convert it for you (which is only slightly cheaper than purchasing one). I literally jumped off of the couch (despite my sore foot) and hobbled as fast as I could to the basement to show B.

Now, why, you may ask, do I care about electric heating? Well, this past summer/fall, as B and I began our hunt for a new furnace and air conditioner, it had been suggested that we try a heat pump. There were 3 main reasons:
1) Because of the size of our house, two small units (one on the main floor and one on our teeny tiny top half), would be able to heat and cool it
2) Yup - you read that right - the unit will save us money as we'll be buying a heating AND cooling system in 1!
3) We'd be able to lose the huge furnace AND all the duct work, and reclaim a lot of space (and some headroom) in our basement

Though I wasn't completely sold on installing electric heating in our home (scary thoughts of house fires started by electric heat!!), B was pretty insistent. The biggest downside - he was talking about installing baseboard heating in the basement to keep it warm and stop the pipes from freezing. Now, I know that they make stuff that looks like actual baseboard now - totally great option - but for some reason I couldn't get THIS kind of image out of my head:




So, this leads us back, full circle, to my excitement when I discovered the small write up on ECORAD last night! It meant that there is a fighting chance that I could get a traditional cast iron radiator as electric heating in our 1920's home (depending on cost, of course). The best part is, the systems are completely environmentally responsible since 99% of their materials used are recycled! Oh yeah - and I almost forgot to mention... they're Canadian!

Yes, I could probably sit here and write all day on the wonderful company that is ECORAD - but I'll leave it at that. If this little piece struck a cord with you - jump on over to their website and check them out!

Anyone have an old radiator they are looking to get rid of? :) I'll get her refurb'd and give 'er a good home... promise!
SHARE:

Wednesday, January 6, 2010

Let There Be Walls!

Yes my friends - B managed to finish drywalling the laundry room tonight (okay... the exception is still that extra tiny wall, but theres a reason for that), while I was out of commission with a sore foot (don't ask).





This is obviously the opposite side of the room than what I've been sharing in previous posts. This is the side that the washer, dryer and sink will be on. No taping or mudding has started yet, because once the drywalling was done, B had to clean up the other half of the basement which became a storage area for a huge amount of miscellaneous items (as well as old basement bathroom fixtures). Now you may be asking, "Why do you have to clean the basement mid reno?". Good question! Well, to demo another wall of course! 





Yes - another wall was (partially) demolished tonight to allow more room to the wonderful people who will come tomorrow to remove our old water heater and bring us a wonderful new tankless variety. Endless hot water - pure bliss, no? 
SHARE:

Tuesday, January 5, 2010

Basement Update - Part II

As I stated at the end of my previous basement update - I won't bore you with all of the daily goings on around here. I'll just say there has been a lot of dust flying in the basement and give you a quick rundown of some of the major highlights of our reno.

After getting all of the walls out from around the bathroom, and all but two from the guest bedroom, B and I realized that there was NO vapor barrier behind the two exterior walls we planned on leaving up. This discovery, of course, led to even MORE demolition, which in the end we agreed was worth it. Thankfully, we didn't have to reframe one of the walls (or so it seemed...) - leaving us only two major walls we had to frame, along with two smaller walls on either side of the new door frame. Framing began on the evening of the 30th, but due to what felt like a stress fracture in my right foot, we had to call it an early night. (Not to mention B was exhausted after working on the basement all week).




Bright and early on New Years Eve, B and I headed out to pick up all of our dry walling needs, and made a few additional stops to continue looking for basement bathroom inspiration. After being gone far longer than we had anticipated, we returned home ready to once again get back down to business.


We had high hopes of ringing in 2010 in a laundry room with at least some drywall on the ceiling - however, this would not be. After a lot of measuring, hammering, drilling into concrete and all kinds of other fun stuff, to get the frames up, I was ready to stop at 10:30. By 11:30 both B and I were showered and ready to ring in the New Year/Decade with a bottle of champagne and a box of chocolates. Not the most exciting New Year - but we were both happy to be spending our first New Years in our first home, working on a project that we were both excited about.




The following day, while I started cleaning (note: basement reno = everything in our house completely displaced) in preparation for our dinner/over night guests on Saturday, B was doing all the electrical work for my laundry room before crawling in and out from under the deck as he created a new hole for our brand new dryer vent. This was by far his least favorite part of the project so far. The next step was to get insulation up for the exterior walls and get the vapor barrier up. Between the two of us, this part was pretty easy.




Later that evening, we unloaded all of the drywall that had been in the truck bed since the previous day. With everything finally inside, we got to work measuring and cutting drywall for the laundry room ceiling. Only two pieces went up the first night, but that, along with actually being able to maneuver all of drywall into the basement, was accomplishment enough for one day.


After taking a break on Saturday to entertain our guests, work resumed Sunday when my parents came over and my Dad helped out in the basement. Together, they were able to finish off the drywall for the ceiling, as well as install our new recessed lighting.


Last night's progress wasn't any more exciting. After spending more time than we planned wandering around IKEA, we returned home and were able to successfully drywall ONE of the laundry/utility room walls. The ONE wall that we didn't reframe because it looked like the person who had done work prior had done a decent job on it. WRONG! Not all of the studs were the same depth (if thats even the right terminology), so when trying to drill into a section of the drywall I was greeted by a not so pleasant ripping sound as the drywall pulled away from the screw. To say it was frustrating would be an understatement. Thankfully we were able to resolve this problem by spacing out the screws on that one stud enough to avoid the worst of it. That combined with the unevenness of the structure of our 90 year old home, meant drywalling was shortlived.




Tonight - we got the biggest drywall project done by completing the back wall. Lots of measuring and cutting was done to make the pieces fit around the outlet, window and our new dryer vent (not pictured). I am now a master of the drywall saw - no lie. It makes me happy to see this progress...




Though progress will be more slow going this week, with both of us back to work, I hope that we'll be ready to tile by the end of the week at the latest. I'm just looking forward to having a nice clean space that I can do laundry in again. Climbing over sheets of drywall and other construction equipment to wash my clothes is getting old... very quickly!
SHARE:

Monday, January 4, 2010

On The Hunt...

See this beautiful sink? Used by none other than the fabulous Sarah Richardson for Sarah's House...

I want it... or at least something like it, to use in our Basement Bathroom. I know that we still have a ways to go before the bathroom starts getting put together (our laundry room doesn't even have walls up yet!) - but I'm on the hunt to find something like it for a good deal. Anyone have any great places to look? (Mainly in Toronto, but I mean if I can find it online I'll take it!)
SHARE:

Sunday, January 3, 2010

What Lies Beneath...

Our basement reno is well underway at our tiny Toronto home. As sledgehammers fly, and dust and debris scatter - I thought I'd give my readers (if there are any) a little update on what we've been working on down below.


Day 1 - Sunday, December 27, 2009: I must start out by saying that in no way did we plan on tearing our basement apart on this fine Sunday evening. The day started off pretty calm. We packed everything up from my parents (where we spent Christmas), dropped by HomeDepot to pick up our new washer and dryer pair and then headed home, with my parents following behind us. While the menfolk unloaded our new appliances from my father's trailer, and hooked up the new dishwasher in the kitchen, my Mom and I headed out to buy some storage bins for stuff we had in the basement, as well as for our Christmas decorations. After a small dinner, B, my father and myself headed downstairs to discuss what our plans were for our basement reno. The gist is that the old tiny office/guest bedroom was to be turned into a bright and airy laundry room, our basement bathroom was getting a complete overhaul, and the remainder of the living space was to be completely redone as well (just a little further down the road). To no one's surprise, shortly after the discussion started the dust masks, hammers and wrecking bar came out and we went to town. As my outfit in this picture will demonstrate - it really was an impromtu demolition session.

After a couple of hours of swinging hammers and weilding a wrecking bar - our basement bathroom and guest bedroom was nothing more than a giant pile of wood and drywall.

There weren't too many surprises this first day. A few moldy spots of drywall (which B was careful to cut up and immediately bag) and of course a bunch of beer caps - which would probably explain the horrible job done not only on the basement, but the work on the rest of the house! 


The biggest surprise was the old wasps nest B stumbled across, where our bathroom ceiling met an outside wall. There wasn't too much too worry about, as the old nest was dried out and had clearly been there for quite sometime without any use. More than anything, it let us know to be extra certain that the exterior of the house is well sealed when we close everything back up. After an exhausting night of ripping our basement apart, we called it quits and headed to bed feeling accomplished and ready for round 2 of demo the following day.


Day 2, Monday, December 28th, 2009: With both of us off work, Monday was the perfect day to head out to do some more shopping for our basement reno before getting back down to demolition. Our first stop was our local Habitat for Humanity ReStore where we were looking for everything - doors, a pedestal sink, a tub - you name it. We scored pretty huge when I found a stack of 375 sq. ft of laminate flooring for $280 bucks. Exactly what we'll need when we finish the living area of the basement. We definitely want to use laminate down there, just incase there ever IS an issue with water - we don't want expensive hardwood getting destroyed, or moldy carpet! We also left carrying a Rhino Bag, a great alternative to renting a dumpster for all of our basement demo waste. From there we picked up some more demolition supplies at Princess Auto before moving on to Home Depot (we really wish there was a Lowes closer to our house), where B needed to pick up a bunch of plumbing supplies. While B was exploring the isles of plumbing, I took off on my own to investigate sinks, vanities and tubs. While exploring I came across a lighting clearance section. To my joy I found THREE boxes of 3 1/4 inch recessed lights for $20 a box! SCORE! B and I inspected them and they are exactly what we need for the basement reno, and with 18 lights in total, we can do our laundry room and bathroom - as well as our kitchen!


Once our rather expensive shopping expedition was complete, we headed home and prepared to empty the basement of all of its debris. Thankfully, our basement windows were large enough to pass the debris out of (and for B to crawl through), so I passed up old pieces of wood and drywall, while B loaded them up in the Rhino Bag. Once we were done, we gave it a sweep and scooped up the smaller debris into some garbage bins.

With everything off the floor, it was time to take out the sledgehammers and break up the nasty green bathroom tile, and very strange mosaic tile floor (if you can call it that) - and of course, finally rip out the awful almond coloured, jetted monstrosity of a tub. After it was removed and B was able to get at the drain, we found our new friend - creepy the frog. An old broken up ceramic dish sponge holder. B promptly put him back together the best he could and let him sit by to supervise the remainder of our demo.

After the floor had been completely broken up and cleared away and B and I started discussing our final plans for the layout of our new laundry room and bathroom. While checking things out, we peeled back the vinyl flooring in what had been the guestroom to face a TON of mildew that we'll need to tackle with a handy bleach solution.

Day 3, Tuesday December 29, 2009: While B was staying home, working away on the basement, I was at work - feeling like I had demolition hang over. I was exhausted, congested feeling (despite my handy dandy dust mask) and hurting all over, but wishing I was at home helping with the work to be done. But - B trudged on, ripping up where the old tub drain used to be and smashing up concrete to create a new drain, where our new shower stall will be. After which, he filled in the old hole for the tub and a few places where the concrete was soft and smashed up when we were removing the old tile floors. Not surprisingly, that work took up most of his day. After we ate, and before the concrete set completely - B went down and wrote our name in the concrete that will be behind the new wall, separating the bathroom and laundry room.

So, Tuesday was pretty much taken up by filling in holes with concrete. A lot more on our plate - a bunch that B will have to do on his own, but a lot that we'll be able to knock out as a team.


Clearly, by this time we have completed much more but I didn't want to get into an overwhelming post of our progress and thought that for now, sharing our first three days would be helpful. I think my next update will spare you on so much of the detail and maybe just provide a quick update on where we've got to at this point. Let's just say, it's finally starting to look like a room!  
SHARE:
Related Posts with Thumbnails
© Life on Misneach Ridge
Blogger Designs by pipdig